Our company is deeply engaged in the papermaking industry, professionally providing services including papermaking equipment sales, plant drawing design, equipment and electrical installation, production line commissioning and operation, and sludge recycling system solutions. We offer one-stop support to help papermaking plants reduce costs, improve quality and strengthen competitiveness.
By reviewing the overall planning of the paper mill, we effectively prevent excessive waste and papermaking process errors at the initial stage of construction — helping your project enter the commissioning and production period faster, get products to market sooner, and earn profits earlier.
Established on 9 April 2025 as our market-facing entity for overseas papermaking services, our core team has been deeply engaged in China's paper industry for 18 years — long-term grounding in the domestic market that underpins every overseas project. We keep refining our production systems and management, committed to helping customers achieve efficient production, green development and rising value.
Corporate Purpose: To build top-tier factories for clients with professional expertise, uphold integrity as the foundation, provide long-term services, and grow into trusted partners.
26 professionals backed by long-term design-institute partnerships — one-stop service from design to operation.

Our 26 in-house professionals include 6 senior papermaking service engineers, 5 electrical & mechanical engineers and 3 equipment installation engineers — all with years of mill operation, retrofit and construction experience, mastering equipment performance, process know-how and maintenance standards.
Through long-term strategic cooperation with renowned design institutes in Shandong, Hunan, Xi'an and Chongqing, we combine professional design capability with our front-line construction and service experience to deliver an integrated design + construction + installation + commissioning + operation service model — covering the full lifecycle from mill planning to running production.
With 20 paper mills served at home and abroad — new construction, retrofit, capacity upgrades and system optimization — we tailor operation and production plans to each customer's scale, product positioning and market demand, cutting costs, stabilizing quality and raising efficiency.
Targeting high water use, material loss and low solid-waste recovery — our differentiated optimization cuts cost while keeping quality.
Fine-tuned adjustments and structural optimization dramatically reduce process water consumption per ton.
Recover fiber lost in production and put it back to work — cutting raw material cost and waste.
Recycle production sludge into reusable resources, achieving circular use of mill waste.
The result: low cost, high quality, low energy use, high resource utilization — greener production without compromise.
What makes our construction and installation services different.
Detailed, reasonable plans from day one covering schedule, resource allocation and quality control — we adjust staffing based on real on-site progress.
Members from different disciplines work closely with smooth information flow, quickly solving problems encountered during project advancement.
Potential risks are identified in advance with response strategies prepared, ensuring the project proceeds smoothly.
Budget management and accounting mechanisms avoid unnecessary expenditure while keeping quality high — including up to 10% material savings through drawing review.
We review and calculate process drawings, compile construction-ready drawings, and sort pipe fittings and materials — reducing rework waste after startup.
Every equipment installation follows our technical standards with detailed data sheets — measurement, calibration and records for every detail, enabling quality tracking.
Our DCS/QCS/MCC/MCS automation carries 15 years of paper machine operation control logic — currently at the top of the industry, producing qualified pulp and product.
Technical communication, quality control, material inspection, delivery timing and spare-parts management prevent quality issues and installation delays.
Layered training — first the diligent and smart operators, who then teach others — with theoretical and on-site exams for every position.
Mill layout review, process drawing audit and calculation, construction schedule and personnel planning.
Foundations and structures built with papermaking process in mind — avoiding the foundation problems that delay other mills by 3–6 months.
Main machines, auxiliary equipment, piping, non-standard fabrication, electrical & instruments, boilers and sewage plant — all data-recorded.
Cleaning, single-machine rotation testing with records, then full-line linkage testing with water flushing to prevent failures.
One week of trial paper output with adjustments, then official production — gradually raising speed to the optimal state while optimizing per-ton consumption.
Full operator training with exams for every position, ensuring your staff can independently produce qualified products.